Related Links/


Advertisements 

In this section

A newly-constructed vehicular interchange between the Pan-Island Expressway (PIE) and Bedok North Avenue 3 was opened to traffic on 29 November 2008.

Works for this road interchange began in June 2006 and involved the construction of four slip roads to connect Bedok North Avenue 3 to the PIE. This also involved works to widen Bedok North Avenue 3 from two lanes to three lanes in both directions. The entire upgrading project was completed at a cost of $20.5 million.

Features

The completed road project includes these features:
  • Four slip roads connecting PIE and Bedok North Avenue 3
  • A dual three-lane Bedok North Avenue 3
  • Two new pedestrian overhead bridges along Bedok North Avenue 3
  • Ramps to the existing pedestrian overhead bridges across PIE
  • Upgraded five bus shelters along Bedok North Avenue 3 and Bedok Reservoir Road

Benefits

With the opening of this vehicular interchange, motorists, especially residents in the Bedok North Estate, will be able to enjoy a direct and faster connection between Bedok North Avenue 3 and the PIE. The new interchange will also serve as an alternative to the two existing interchanges with the PIE at Bedok North and Simei.

Site Photos

View from Slip Road to PIE Tuas

View from Slip road PIE Changi bound
to Bedok North Avenue 3

View from Slip Road to PIE Changi

View from Bedok North Avenue 3 Blk 761

Related Link

Trees Cut for Road Works (ST 16 Apr 07) [114 Kb]
Last Updated: 5 December 2008